Contact us
Get in touch with your local office or speak with our customer service team.
If you're connecting power to a property or block of land where there has never been a connection to the Horizon Power network before, you'll need to request a new connection.
If you need a temporary power supply for your builder to carry out works, or a permanent supply to your new home, you'll need to install a meter so you can be billed for the electricity you use. There must already be a connection to the electricity network available at the property i.e. a service pillar (green dome). They’re typically located just inside the property boundary.
You can call us on 1800 267 926 or complete the Installation of a new meter form to request one of the following connections:
All prices are correct as at 1 July 2021, include GST (except where noted otherwise), and are subject to change at any time.
If you need to increase your existing supply to accommodate new home workshop equipment, or perhaps you're expanding your business and the power needs upgrading to suit your needs. Whatever the reason, you can request a supply upgrade using the form below.
All prices are correct as at 1 July 2021, include GST (except where noted otherwise), and are subject to change at any time.
A fee of $611.20 is payable to request to either temporarily or permanently disconnect the power supply to your property.
Complete this form to request one of the following:
Please note:
All prices are correct as at 1 July 2021, include GST (except where noted otherwise), and are subject to change at any time.
Quote required. Requests for streetlights, traffic lights and boom gates are assessed on application and a quote will be provided.
Quote required. Complete this form to request a quote to attach either decorative works (e.g. banners) or CCTV cameras to Horizon Power assets, in accordance with the Third Party Attachments Policy.
A fee of $1,215.00 is payable to provide network information to developers to assist with their planning. This fee is a fixed fee regardless of the size of the development works.
Quote required. If you need to relocate distribution equipment such as transformers, pillars and overhead lines, please complete this application form and we will provide a quote for the work required. Relocation is subject to a suitable alternative location and will be chargeable to the applicant.
A fee at the subsidised rate of $4,973.50 (up to 3 dwellings) is payable if you meet the terms and conditions. If you do not meet the terms and conditions, your application will be assessed and quoted on a case-by-case basis. An underground power supply is mandatory for all new connections and upgrades.
Please note: you will need to engage the services of an electrical contractor to connect power from the pillar to your meter box. (Existing network disconnection and re-connection charge excluded, new connection, perm meter connection charge will appear on the customer's first invoice).
All prices are correct as at 1 July 2021, include GST (except where noted otherwise), and are subject to change at any time.
All prices are correct as at 1 July 2021, include GST (except where noted otherwise), and are subject to change at any time.
Basic Micro EG Connection (Single phase <=10kVA or Three phase <=30kVA)
There are no fees to apply to install a renewable energy system or to participate in our buyback offer for standard applications (systems that do not include Renewable Energy Smoothing or Feed-In Management). However, a meter re-configuration fee may apply once your system is installed. This fee will appear on your first bill.
In many of our towns, the Basic Micro EG solar energy systems can only be installed if it is provisioned for FIM. In addition to your panels and inverter, you will need to install a power outlet and an enclosure box so the system can be retrofitted with a FIM device at a later date. Please refer to the Technical Requirements and the Eligibility calculator to find out if this requirement applies to you. Your installer can also explain this to you in more detail.
If your system is provisioned for Feed-In Management and we determine, in the future, that a FIM device is required, we will retrofit your system with a device in your enclosure. Both the FIM device and the retrofit will be at Horizon Power’s cost. We will contact you to discuss any changes to your renewable energy system before it takes place.
LV EG Connection (>30kVA to 200kVA or >200kVA to 1,000kVA)
For those applications that require more detailed technical assessments or which require Feed-In Management, at the time of installation, your application may be subject to additional fees and charges, including but not limited to:
Horizon Power will advise you of any additional fees and charges as part of the application process.
All prices are correct as at 1 July 2021, include GST (except where noted otherwise), and are subject to change at any time.